24 Battery Storage Units Smartly Connected
Jointly Controlling Decentralised Battery Storage Units
A pilot project involving 24 networked battery storage systems at ten transformer stations has been launched in Wolkersdorf, Lower Austria. Together, the storage systems have a capacity of approximately 5 MWh. The project is investigating how decentralised energy storage can help relieve the distribution grid and better integrate renewable energy into the existing grid.
A unique feature of the project is the flexible grid access permits, which Netz Niederösterreich granted for the first time in Austria. When grid load is high, the grid operator specifies so-called envelope curves. These define the parameters within which the battery storage systems can operate.
This is where ecocoach’s ecoEnergyCoach comes into play. Our energy management system coordinates the individual storage units and controls their operation within the grid’s specifications. This allows the decentralised battery storage units to be operated collectively as a controllable system.
Electrify Smart Energy is implementing the pilot project in collaboration with EVN and Netz Niederösterreich. The research project is supported by ecoplus and the University of Continuing Education Krems. If the project is successful, a further rollout in Lower Austria is planned starting in 2027.
For ecocoach, the project demonstrates another application area for energy management. When battery storage systems are operated in a coordinated manner rather than in isolation, they can respond flexibly to the demands of the power grid.



